From inside (document excerpt):
58PHA/PHX Performance Boost 80 4 Way Multipoise Induced Combustion Gas Furnace Input Capacities: 45,000 thru 135,000 Btuh Installation, Start up, Operating and Service and Maintenance Instructions Series 100/A SAFETY CONSIDERATIONS 2 INTRODUCTION 3 CODES AND STANDARDS 4 Safety 4 General Installation . 5 Combustion and Ventilation Air . 5 Duct Systems . 5 Acoustical Lining and Fibrous Glass Duct . 5 Gas Piping and Gas Pipe Pressure Testing .
Heating, Ventilating and Air Conditioning User Manual Free Download. HAVC Operator’s Manual. Gas Furnace and AC Free Instruction Manual Download PDF.
5 Electrical Connections 5 Venting 5 ELECTROSTATIC DISCHARGE PRECAUTIONS PROCEDURE . 5 LOCATION . 6 INSTALLATION 10 Upflow Installation 10 Downflow Installation . 11 Horizontal Installation . 13 Filter Arrangement 14 Air Ducts . 14 Gas Piping 17 115- Wiring 22 -V START-UP, ADJUSTMENT, AND SAFETY CHECK . 36 General . 36 Start- Procedures . 36 -up Adjustments . 36 Check Safety Controls . 39 NOTE: Read the entire instruction manual before starting the installation. Portions of the text and tables are reprinted from NFPA 54/ANSI Z223.1-2006E, with permission of National Fire Protection Association, Quincy, MA 02269 and American Gas Association, Washington DC 20001. This reprinted material is not the complete and official position of the NFPA or ANSI on the referenced subject, which is represented only by the standard in its entirety. REGISTERED Checklist 40 SERVICE AND MAINTENANCE PROCEDURES . 43 Introduction . 43 Care and Maintenance . 46 Sequence of Operation . 49 Wiring Diagrams . 51 Troubleshooting 51 ama ISO 9001:2000 CERTIFIED (664mm).